Customization: | Available |
---|---|
Product Name: | Master Link Assembly |
Surface Treatment: | Plastic Spraying |
Still deciding? Get samples of US$ 0/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Factory G80 US Type Forged Alloy steel Master Link Assembly
- Surface treatment :WLL, Size, Grade, CE,
- Application: Used for connection operations
- Special specifications and signs can be made according to customer requirements
Packing: carton packing, lined plastic bags, iron tray
- B. L= 4 *WLL
- all tracebility
All links are high quality quenching and tempering.
Widely used for industrial lifting purposes.
Powder coating is available, usually in red, yellow, orange or upon customer's request
Available types:
A342 Forged main connecting rod (no welding)
A345 Main Link Assembly (forged main link)
A344 Main connection (welded) to engineering plane
Main connecting rod assembly (welded)
A343 Main Connecting rod (Welded)
A346 Main Connecting rod assembly (welded)
Test piece by piece at 2.5 times working load
Every rigging must pass a standard test.
Ten million roads, safety first, quality is our first criterion.
Product Description
Material | Carbon steel, Alloy steel, Stainless steel 304 or 316 |
Finish | Hot Dipped Galvanized, Electro Galvanized, Color Painted, High polished, Mirror Polished |
Technology | Drop forged |
M.O.Q | 100PCS per Size |
MBS | 6 times WLL or 4 times WLL |
Packing | Gunny bag or carton and pallet / by customer requirements. |
Delivery time | 15-20 work days after order confirmation |
Payment term | T/T, L/C, Western Union |
Business type | Manufacturer, trading |
Certifications | ISO9001,CE,BV,SGS |
Notes | Special specifications and marks can be made according to customers requirements. |
Still struggling with these questions?
The environment of inconvenience
2.Tools are bulky and inconvenient to use
Packaging & Shipping
Packing: Packed in the gunny bag or carton, then put on the pallet.
Shipment: By sea, air or express
Delivery time: In generally, it need 20-25 work days after we receipt of your order and deposit