• High Quality a-342 Alloy Steel G80 Master Link Chain Components
  • High Quality a-342 Alloy Steel G80 Master Link Chain Components
  • High Quality a-342 Alloy Steel G80 Master Link Chain Components
  • High Quality a-342 Alloy Steel G80 Master Link Chain Components
  • High Quality a-342 Alloy Steel G80 Master Link Chain Components
  • High Quality a-342 Alloy Steel G80 Master Link Chain Components

High Quality a-342 Alloy Steel G80 Master Link Chain Components

Material: Alloy Steel
Shape: Oblong
Usage: Industrial, Household
Samples:
US$ 0/Piece 1 Piece(Min.Order)
| Order Sample
Customization:
Shipping Cost:

Estimated freight per unit.

about shipping cost and estimated delivery time.
Payment Method: visa mastercard discover JCB diners club american express T/T
  Initial Payment Full Payment
Currency: US$
Return&refunds: You can apply for a refund up to 30 days after receipt of the products.
From payment to delivery, we protect your trading.
High Quality a-342 Alloy Steel G80 Master Link Chain Components pictures & photos
High Quality a-342 Alloy Steel G80 Master Link Chain Components
US $0.9-4.99 / Piece
Min. Order: 100 Pieces
Manufacturer/Factory & Trading Company
Diamond Member Since 2017

Suppliers with verified business licenses

Secured Trading Service
Rating: 5.0/5
Shandong, China
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
In-stock Capacity
The supplier has In-stock capacity
Quality Assurance
The supplier provides quality assurance
Management Certification
The supplier has quality management system certification, including:
ISO9001:2015 certificate
to see all verified strength labels (21)

Basic Info.

Model NO.
A342
Color
Red, Yellow, Blue
Condition
Used
Product Name
A343 Master Link
Process
Heat Treatment+Surface Treatment
Certificates
ISO9001, CE
Size
76-8"~72"
Surface Treatment
Plastic Coating
Coloer
Red, Yellow, Blue
MOQ
100PCS
Trade Term
Fob, CFR, CIF
Grade
G80/100
Payment Term
Western Union, T/T, L/C
Wll
12300lbs ~ 373000lbs
Lead Time
10-15 Work Days
Application
Lifting Chain Slings, Webbing Slings
Sample
Available
Shipment
by Sea, Air or Express
Transport Package
Packed in Wooden Case, Then in Pallets.
Specification
76-8"~72"
Trademark
First Rigging
Origin
Shandong China
HS Code
7326909000
Production Capacity
150 Tons/Month

Product Description

High Quality A-342 Alloy Steel G80 Master Link Chain Components 
Forged per Alloy Steel -Quench ed and Tempered
High quality alloy steel material
Suitable for EN818-2 G80 chain and web sling Surface finish: Powder Plastified
Colour code: Red / Yellow /Blue. Other colour is available as per request

The design coefficient of the chain is 4:1, and that of the wire rope is 5:1.
Separate validation tests 2.5 times the workload limit (4:1), unless otherwise stated, and with certification.
High Quality a-342 Alloy Steel G80 Master Link Chain Components
Specification

product name G80 Master Link A342 A343 A346 Master Link And Welded Link
material alloy steel ,carbon steel and stainless steel
Standard A342 A343 A346
Function Lifting Chain Slings, Webbing Slings
brand name FST
package Bag or Carton and steel pallets according to customers required
delivery 15-25 WORK days according customer required
size 1.6T-63T
Surface galvanised/hot dipped galvanised/polish
payment term T/T  L/C
Main products
Eye bolts,Shackles,Turnbuckles,Wire Rope Clips,Load binders,Lifting Hooks,Connecting Links,Master Links,Swivels and many other
rigging hardwares.
1.Adopt high quality alloy steel, refuse to cut corners.
2.Welding or forging by professional personnel, surface spray treatment.
High Quality a-342 Alloy Steel G80 Master Link Chain Components
High Quality a-342 Alloy Steel G80 Master Link Chain Components
3.Unique structure design, suitable for customers to use, easy to operate, easy to maintain, improve efficiency
4.Before the product is put into use, please carry out tensile test. The minimum breaking tension is 4 times the rated load

Our Services
1.Experience: 12 years experience in manufacturing and exporting rigging hardware.  
2.Reply to your inquiry within 24 hours.
3. Customizable design. OEM and ODM are welcome
4. Based on your sample, drawing or design, provide a return sample for 2-3 weeks
5. Free samples
6.When you come to our office, we can pick you up at the airport or in the hotel. 
7.Certification: ISO, CE Certificated, product quality strictly controlled by QC depart.

High Quality a-342 Alloy Steel G80 Master Link Chain Components
Certifications
We test each order in three steps.
1. Material testing before production.
2. Random testing during production
3. Test finished products before shipment.
High Quality a-342 Alloy Steel G80 Master Link Chain Components
High Quality a-342 Alloy Steel G80 Master Link Chain Components
 

Company Profile

We are a factory with more than 24 years of experience in hardware and rigging production and sales, ranking among the top three in Shandong Province. professional manufacturer of high strength chain, lifting chain, double ring buckle, loader protection chain, rigging, testing equipment is complete, strong technical force.
We have different technical department personnel to solve problems for you, to provide you with the most professional service.
Our business staff are all professionals engaged in the foreign trade industry for more than 5 years, especially our foreign trade manager, who has more than 10 years of foreign trade experience.  We can not only provide you with the best products and price, but also provide you with the most professional service.

High Quality a-342 Alloy Steel G80 Master Link Chain Components

Packaging & Shipping
Packing: Packed in the gunny bag or carton, then put on the pallet.

Shipment: By sea, air or express

Delivery time: In generally, it need 20-25 work days after we receipt of your order and deposit
 

High Quality a-342 Alloy Steel G80 Master Link Chain Components
High Quality a-342 Alloy Steel G80 Master Link Chain Components


FAQ

1.What's your trems of payment?

1) T/T. 30% in advance, 70% before delivery
2)L/C

2. Can you give me a sample for reference?
Yes, we can provide a free sample for your reference, you only need to bear the express freight.

3. Do you have a minimum order quantity?
Our professional hardware production factory, the minimum order quantity is 1000pcs, choose the appropriate shipping method, in order to reduce the transportation cost for you

4. What's your packing?
Into cartons or gunny bags and then into pallets. We can also do it according to your request

5. What is the delivery time?
Usually the delivery time is 15-25work days after receiving the order and deposit


 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

From payment to delivery, we protect your trading.
High Quality a-342 Alloy Steel G80 Master Link Chain Components pictures & photos
High Quality a-342 Alloy Steel G80 Master Link Chain Components
US $0.9-4.99 / Piece
Min. Order: 100 Pieces
Diamond Member Since 2017

Suppliers with verified business licenses

Secured Trading Service
Rating: 5.0/5
Manufacturer/Factory & Trading Company
Number of Employees
22
Year of Establishment
2010-04-23