• G80 Forged Alloy Welded Master Link for Railway Hoist
  • G80 Forged Alloy Welded Master Link for Railway Hoist
  • G80 Forged Alloy Welded Master Link for Railway Hoist
  • G80 Forged Alloy Welded Master Link for Railway Hoist
  • G80 Forged Alloy Welded Master Link for Railway Hoist
  • G80 Forged Alloy Welded Master Link for Railway Hoist

G80 Forged Alloy Welded Master Link for Railway Hoist

Material: Carbon Steel
Surface Treatment: Powder Coated, Electric Galv.
Product Name: A342 Master Link
Samples:
US$ 0/Piece 1 Piece(Min.Order)
| Order Sample
Customization:
Shipping Cost:

Estimated freight per unit.

about shipping cost and estimated delivery time.
Payment Method: visa mastercard discover JCB diners club american express T/T
  Initial Payment Full Payment
Currency: US$
Return&refunds: You can apply for a refund up to 30 days after receipt of the products.
From payment to delivery, we protect your trading.
G80 Forged Alloy Welded Master Link for Railway Hoist pictures & photos
G80 Forged Alloy Welded Master Link for Railway Hoist
US $0.3-10 / Piece
Min. Order: 10 Pieces
Manufacturer/Factory & Trading Company
Diamond Member Since 2017

Suppliers with verified business licenses

Secured Trading Service
Rating: 5.0/5
Shandong, China
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
In-stock Capacity
The supplier has In-stock capacity
Quality Assurance
The supplier provides quality assurance
Management Certification
The supplier has quality management system certification, including:
ISO9001:2015 certificate
to see all verified strength labels (21)

Basic Info.

Model NO.
A342
Size
1/2"~4"
Certificates
ISO9001, CE, BV
Process
Heat Treatment+Surface Treatment
Grade
G80/100
MOQ
100PCS
Feature
Western Union, T/T
Trade Term
Fob, CFR, CIF
Wll
12300lbs ~ 373000lbs
Lead Time
Within 10 Works Days After Receive Deposit
Application
Lifting Chain Slings, Webbing Slings
Sample
Available
Shipment
by Sea, Air or Express
Business Type
Manufacturer and Exporter
Colour
Red/Yellow
Transport Package
Carton Packing, Then in Pallets.
Specification
Alloy steel
Trademark
First rigging
Origin
China
HS Code
7326909000
Production Capacity
150 Tons/Month

Packaging & Delivery

Package Size
40.00cm * 15.00cm * 10.00cm
Package Gross Weight
6.000kg

Product Description

G80 Forged Alloy Welded Master Link for Railway Hoist

Product Description

These Master rings are made from weldless, forged steel. They are commonly used in many rigging scenarios, such as with ring chokers for logging. Because they are load-rated and carry a safety factor of 5:1, we can install them on slings and bridles as needed provided the Working Load Limit.
G80 Forged Alloy Welded Master Link for Railway Hoist

Product introduction

Material

Corbon steel;Alloy steel;Stainless steel

Size

Different size available

Surface

Polished or zinc plated or chromed or self-color

Usage

construction, highway and bridge,Port transport etc.

MOQ

10pcs

Capacity

100000pcs/Month

Package

clean poly bags in cartons and then on pallets or as customer requirements

Sample time

7-10 Work days,International express delivery time is very fast

Certifications ISO9001,CE,BV,SGS

Lead time

15-20 Work days based on the order quantity.

Payment Terms

30% deposit in advance, 70% before shipment

Main products Eye bolts,Shackles,Turnbuckles,Wire Rope Clips,Load binders,Lifting Hooks,Connecting Links,Master Links,Swivels and many other
rigging hardwares.
Product Detail
G80 Forged Alloy Welded Master Link for Railway Hoist
Highly selected alloy steel with high strength and toughness has a long service life
Strict use of raw materials, refuse to cut corners, every product is carefully manufactured

 
Fastener screws, strong, wear-resistant, not easy to slip, stable and reliable
Many years of industry production experience, mature technology, exquisite technology
G80 Forged Alloy Welded Master Link for Railway Hoist
Customization process
Contact us to provide product specification details - confirm the surface treatment process - confirm the intention to sign the contract to pay the deposit - immediately arrange the production plan - follow up the production plan - package and arrange the delivery after the completion of the quality inspection - confirm the receipt of the goods after the inspection no quality problems - reply promptly to any problems of after-sales service
G80 Forged Alloy Welded Master Link for Railway Hoist
Product Application
Used in electric power, construction, highway and bridge,Port transport, metallurgy, mine engineering, etc
It can also be used with chain, steel wire rope, double ring buckle, hook and other accessories
G80 Forged Alloy Welded Master Link for Railway Hoist

Our Advantage
1.Strictly control product quality and use professional testing equipment to test products to ensure product standards

2.Sufficient inventory complete specifications can be used with any support customized
3.Manufacturers supply physical manufacturers supply, no middlemen to earn profits, reduce procurement costs

4.Large car delivery spot fast logistics information tracking, information real-time transmission
G80 Forged Alloy Welded Master Link for Railway Hoist
G80 Forged Alloy Welded Master Link for Railway Hoist
Why choose us
1.Our product models, support customization, if there is a need, please call for advice.
2.We will check the quality of each batch of goods before delivery. If there is any quality problem in production after receiving the goods, or quality problem caused by express transportation, please contact us.

3.Products are shot in kind, due to the display and light and other reasons may be slightly different color, are normal, please refer to the physical prevail. Color difference is mainly a display problem, not a quality problem
4.The actual delivery time shall be subject to the time agreed by both parties. In case of large-scale activities and other reasons, the delivery speed will be relatively late. Please kindly understand
G80 Forged Alloy Welded Master Link for Railway Hoist
G80 Forged Alloy Welded Master Link for Railway Hoist

Notes 
1) Before each use, the operator must perform a safety inspection on the sling and use it only after being qualified;
2) The sling must be inspected regularly by professionals (trained qualified personnel) every month;
3) If it is found that the dimensional wear of the sling is greater than 5% of the original size, it must be replaced in time;
4) If it is found that the amount of dimensional deformation exceeds 3% of the original size, it must be replaced in time to ensure safety.





 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

From payment to delivery, we protect your trading.
G80 Forged Alloy Welded Master Link for Railway Hoist pictures & photos
G80 Forged Alloy Welded Master Link for Railway Hoist
US $0.3-10 / Piece
Min. Order: 10 Pieces
Diamond Member Since 2017

Suppliers with verified business licenses

Secured Trading Service
Rating: 5.0/5
Manufacturer/Factory & Trading Company
Number of Employees
22
Year of Establishment
2010-04-23