• a-345 Forged Master Link Assembly with Plastic Spraying
  • a-345 Forged Master Link Assembly with Plastic Spraying
  • a-345 Forged Master Link Assembly with Plastic Spraying
  • a-345 Forged Master Link Assembly with Plastic Spraying
  • a-345 Forged Master Link Assembly with Plastic Spraying
  • a-345 Forged Master Link Assembly with Plastic Spraying

a-345 Forged Master Link Assembly with Plastic Spraying

Product Name: A345 Master Link
Surface Treatment: Plastic Spraying
Color: Red ,Yellow ,Blue
Samples:
US$ 0/Piece 1 Piece(Min.Order)
| Order Sample
Customization:
Shipping Cost:

Estimated freight per unit.

about shipping cost and estimated delivery time.
Payment Method: visa mastercard discover JCB diners club american express T/T
  Initial Payment Full Payment
Currency: US$
Return&refunds: You can apply for a refund up to 30 days after receipt of the products.
From payment to delivery, we protect your trading.
a-345 Forged Master Link Assembly with Plastic Spraying pictures & photos
a-345 Forged Master Link Assembly with Plastic Spraying
US $0.3-5 / Piece
Min. Order: 1 Piece
Manufacturer/Factory & Trading Company
Diamond Member Since 2017

Suppliers with verified business licenses

Secured Trading Service
Rating: 5.0/5
Shandong, China
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
In-stock Capacity
The supplier has In-stock capacity
Quality Assurance
The supplier provides quality assurance
Management Certification
The supplier has quality management system certification, including:
ISO9001:2015 certificate
to see all verified strength labels (21)

Basic Info.

Model NO.
FST-A345
Material
Carbon Steel,Alloy Steel
Size
3/4"~3"
Grade
G80/100
MOQ
1PC
Process
Heat Treatment+Surface Treatment
Payment Term
Western Union, T/T, L/C
Trade Term
Fob, CFR, CIF
Wll
4.7t-70t
Lead Time
10-15 Work Days
Application
Lifting Chain Slings, Webbing Slings
Sample
Available
Shipment
by Sea, Air or Express
Transport Package
Packed in Carton, Then in Pallets.
Specification
3/4"~3"
Trademark
First Rigging
Origin
Shandong China
HS Code
7326909000
Production Capacity
150 Tons/Month

Packaging & Delivery

Package Size
40.00cm * 15.00cm * 10.00cm
Package Gross Weight
6.000kg

Product Description

A-345 Forged Master Link Assembly with Plastic Spraying
- Surface treatment :WLL, Size, Grade, CE, 
- Application: Used for connection operations
- Special specifications and signs can be made according to customer requirements
Packing: carton packing, lined plastic bags, iron tray
- B. L= 4 *WLL
- all tracebility
All links are high quality quenching and tempering.
Widely used for industrial lifting purposes.
a-345 Forged Master Link Assembly with Plastic Spraying
Powder coating is available, usually in red, yellow, orange or upon customer's request
Available types:
A342 Forged main connecting rod (no welding)
A345 Main Link Assembly (forged main link)
A344 Main connection (welded) to engineering plane
Main connecting rod assembly (welded)
A343 Main Connecting rod (Welded)
A346 Main Connecting rod assembly (welded)
a-345 Forged Master Link Assembly with Plastic Spraying

Test piece by piece at 2.5 times working load 

Every rigging must pass a standard test.

Ten million roads, safety first, quality is our first criterion.

Each rigging must be checked for magnetic particles. Nondestructive testing prevents problems before they happen. Magnetic powder detection, so that you safe and reliable.
a-345 Forged Master Link Assembly with Plastic Spraying

Product Description

Material Carbon steel, Alloy steel, Stainless steel 304 or 316
Finish Hot Dipped Galvanized, Electro Galvanized, Color Painted, High polished, Mirror Polished
Technology Drop forged
M.O.Q 100PCS per Size
MBS 6 times WLL or 4 times WLL
Packing Gunny bag or carton and pallet / by customer requirements.
Delivery time 15-20 work days after order confirmation
Payment term T/T, L/C, Western Union
Business type Manufacturer, trading
Certifications ISO9001,CE,BV,SGS
Notes Special specifications and marks can be made according to customers requirements.
size A B D a b d WLL(T) Weight(kg)
3/4 140 70 20 85 40 14 4.2 1.67
7/8 160 95 22 85 40 14 5.3 2.2
1 178 89 25 100 60 18 8 3.29
1-1/4 220 100 32 100 60 22 14 6.3
1-1/2 267 135 38 180 100 30 21.2 13.7
1-3/4 305 152 45 180 100 32 30 21.25
2 356 178 50 180 100 38 39.4 30.34
2-1/4 406 203 57 180 100 45 45 39.87
2-1/2 406 203 64 355 178 50 55.5 64.4
2-3/4 406 241 70 406 203 57 63 89
3 457 228 76 406 203 64 70 112.14

Still struggling with these questions?

1.Without electricity environment

The environment of inconvenience
2.
Tools are bulky and inconvenient to use

3.Work space is limited
4.Tools are bulky and difficult to move
a-345 Forged Master Link Assembly with Plastic Spraying

Details reveal quality
Carefully select material
Durable, quality clearance, just to let you rest assured to buy!
To control the quality
Reliable quality, strict control of product quality, no processing, can be used directly!
Smooth surface
Fine surface polishing, smooth without burr, small surface pores to corrosion!
a-345 Forged Master Link Assembly with Plastic Spraying

Quality first, customer uppermost.
1. Any enquiries will be answered within 12 hours.
2. Our price is very competitive because we are the original manufacturer.
3.OEM/ODM is acceptable.
4. We have strict testing and quality control system to ensure the quality of products.
5. Your business relationship with us will be confidential to any third party.
6. Good after-sales service, one year warranty for all products.
a-345 Forged Master Link Assembly with Plastic Spraying
a-345 Forged Master Link Assembly with Plastic Spraying

Packaging & Shipping

Packing: Packed in the gunny bag or carton, then put on the pallet.

Shipment: By sea, air or express

Delivery time: In generally, it need 20-25 work days after we receipt of your order and deposit
a-345 Forged Master Link Assembly with Plastic Spraying


FAQ

Weifang First Rigging Co., Ltd.
Q: Are you trading company or manufacturer ?
A: We are a manufacturer with nearly 12 years of experience.

Q: What are your advantages in all these manufacturers?

A: We have a target that we will supply you products and service of high quality and reasonable price.

Q: How long is your delivery time?

A: According to the quantity and products you order, normally15-20 work days, Generally it is 7-10work days if the goods are in stock.

Q:Do you offer free samples?

A: We can provide you with free samples if the value is not too high, but you need to pay the freight charge.

Q:How can you guarantee the quality of the products we order?

A: We have matching test machines and can do the test for all of the products you order, and we can provide you with the quality certificate.

Q: Can we have a visit to your factory?

A: Welcome to our factory, and we will arrange the pick-up.



 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

From payment to delivery, we protect your trading.
a-345 Forged Master Link Assembly with Plastic Spraying pictures & photos
a-345 Forged Master Link Assembly with Plastic Spraying
US $0.3-5 / Piece
Min. Order: 1 Piece
Diamond Member Since 2017

Suppliers with verified business licenses

Secured Trading Service
Rating: 5.0/5
Manufacturer/Factory & Trading Company
Number of Employees
22
Year of Establishment
2010-04-23