• G80 Forged Master Link Assembly with Flat
  • G80 Forged Master Link Assembly with Flat
  • G80 Forged Master Link Assembly with Flat
  • G80 Forged Master Link Assembly with Flat
  • G80 Forged Master Link Assembly with Flat
  • G80 Forged Master Link Assembly with Flat

G80 Forged Master Link Assembly with Flat

Product Name: Master Link Assembly
Surface Treatment: Powder Coated
Color: Red ,Yellow ,Blue
Samples:
US$ 0/Piece 1 Piece(Min.Order)
| Order Sample
Customization:
Shipping Cost:

Estimated freight per unit.

about shipping cost and estimated delivery time.
Payment Method: visa mastercard discover JCB diners club american express T/T
  Initial Payment Full Payment
Currency: US$
Return&refunds: You can apply for a refund up to 30 days after receipt of the products.
From payment to delivery, we protect your trading.
G80 Forged Master Link Assembly with Flat pictures & photos
G80 Forged Master Link Assembly with Flat
US $0.3-5 / Piece
Min. Order: 1 Piece
Manufacturer/Factory & Trading Company
Diamond Member Since 2017

Suppliers with verified business licenses

Secured Trading Service
Rating: 5.0/5
Shandong, China
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
In-stock Capacity
The supplier has In-stock capacity
Quality Assurance
The supplier provides quality assurance
Management Certification
The supplier has quality management system certification, including:
ISO9001:2015 certificate
to see all verified strength labels (21)

Basic Info.

Model NO.
A346
Material
Carbon Steel
Size
6-8to32-8
Trade Term
Fob, CFR, CIF
Process
Drop Forged
Use
Lifting, Lifting Point, Lashing
Inspection
Mill Test Certificate Can Be Provided
Payment Term
Western Union, T/T, L/C
Wll
2.36t-63t
Treatment
Quenched and Tempered
Lead Time
10-15 Work Days
Sample
Available
Application
Lifting Fittings
Transport Package
Packed in Carton, Then in Pallets.
Specification
6-8to32-8
Trademark
First Rigging
Origin
Shandong China
HS Code
73269090
Production Capacity
150 Tons/Month

Packaging & Delivery

Package Size
40.00cm * 15.00cm * 10.00cm
Package Gross Weight
6.000kg

Product Description

Forged Weld G80 Grade 100 Track Master Link Assembly
* Manufactured from G80 alloy steel - Quenched and Tempered
* 6-18MM: all welded; 20-32MM: Upper-terminal link by forged, intermediate by welded.
* Suitable for G80 lifting chains.
* Individually proof test at 2.5 times Working Load Limit.
* Fatigue tested at 1.5 times WLL for 2000 cycles each batch.
* 100% magnaflux crack detection.
* With safety factor of 4:1 for chain sling; 5:1 for wire rope slings.
* Conforms to EN1677-4, AS 3776.
* Suit for 3 or 4 G80 chain sling as per EN818-4 or AS3775.
* fOR USE WITH WIRE ROPE SLING, REFER TO din3088: with synthetic sling, refer to EN1492-1.
* pRESSING FLAT AVAILABLE UPON REQUEST RANGE FRON 6-20MM, suit to Omega Link.
G80 Forged Master Link Assembly with FlatG80 Forged Master Link Assembly with Flat
Specification
G80 Forged Master Link Assembly with Flat
SPEC. A B D a b d WLL(T) WEIGHT(KG)
6-8 135 75 18 54 25 13 2.36T 1.18
7-8 135 75 18 60 38 13 3.15T 1.24
8-8 160 90 22 70 34 16 4.25T 2.2
10-8 180 100 26 85 40 18 6.7T 3.4
13-8 200 110 32 115 50 22 11.2T 6.1
16-8 260 140 36 140 65 26 17T 9.98
18-8 340 180 45 180 100 32 21.2T 18.9
20-8 350 190 50 180 100 32 26.5T 22.6
22-8 350 190 50 180 100 36 31.5T 25.2
26-8 400 200 56 200 110 40 45T 34.26
28-8 430 220 63 200 110 45 50T 47.11
32-8 460 250 72 200 110 50 63T 66.46
Usage Machining, Harbour Handling, Ship building, Power installation, Transportation

Color

Yellow or follow your wishes

Package

Standard packing

Condition

100%new

Payment terms

T/T or L/C or other as you like

Discount Large quantity, large discount
Note Special specifications and marks can be made according to customers requirements
delivery time Within 15 work days or advised by customer
Price Factory direct price
Inquiry

Your Quantity? Your Safety Factor? you length?

G80 Forged Master Link Assembly with Flat
Adopt high quality alloy steel and refuse to cut corners.
Welded or forged by professionals,thesurfaceafter plastic spray treatment.
Unique structure design, for the use of customers, easy to operate, easy to maintain, improve efficiency.
Before the product is put into use, perform pull test.The minimum breaking tension is 4 times the rated load.
G80 Forged Master Link Assembly with Flat


Our Advantages:
1. Competitive price: Skilled workers, effective production line and streamlined management make our price more competitive.
2, high quality: from raw materials to finished products, each link has a specially-assigned quality inspection and control. Before shipment, we will test all products and provide the test report to customers for reference.
3. Timely delivery: Usually our delivery time is 35-45 days. If the customer has an emergency, special situation, we are willing to help the customer get a better way to shorten the delivery time.
4. Professional service: Our sales team is very professional and can provide professional services and suggestions from customers' inquiry to shipment.
G80 Forged Master Link Assembly with Flat

Quality first, customer uppermost.
1. Any inquiries will be replied within 12 hours.
2. Our price is competitive because we are the original manufacturer.
3. OEM/ODM are acceptable.

4. We have strict test and QC system to guarantee the quality.
5. Your business relationship with us will be confidential to any third party.
6. Good after-sale service, all products have one year warranty.

G80 Forged Master Link Assembly with Flat
G80 Forged Master Link Assembly with Flat

Packing and shipping
G80 Forged Master Link Assembly with Flat
G80 Forged Master Link Assembly with Flat
FAQ

Q: Are you trading company or manufacturer ?
A: We are a manufacturer with nearly 24 years of experience.

Q: Do you accept the drawing we supply and OEM?

A: Yes, we can design the lifting beams and lifting clamps according to your requirements, and we can produce the product according to your drawing. We also supply OEM service.

Q: What are your advantages in all these manufacturers?

A: We have a target that we will supply you products and service of high quality and reasonable price.

Q: How long is your delivery time?
A: According to the quantity and products you order, normally 5~30days, Generally it is 10-15work days if the goods are in stock.

Q: What is your terms of payment ?

A: Payment≤1000USD, 100% T/T in advance. Payment>1000USD, 30% T/T in advance ,balance before shipment. Irrepealably L/C at sight.

Q: Do you offer free samples?

A: We can provide you with free samples if the value is not too high, but you need to pay the freight charge.

Q: How can you guarantee the quality of the products we order?

A: We have matching test machines and can do the test for all of the products you order, and we can provide you with the quality certificate.

Q: Can we have a visit to your factory?

A: Welcome to our factory, and we will arrange the pick-up.


 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

From payment to delivery, we protect your trading.
G80 Forged Master Link Assembly with Flat pictures & photos
G80 Forged Master Link Assembly with Flat
US $0.3-5 / Piece
Min. Order: 1 Piece
Diamond Member Since 2017

Suppliers with verified business licenses

Secured Trading Service
Rating: 5.0/5
Manufacturer/Factory & Trading Company
Number of Employees
22
Year of Establishment
2010-04-23